| | Print | |
|
How much will it cost? ALLPLAY Complex has been designed to be build in two phases. $800,000 has been pledged to complete phase I. Phase II is currently unfunded, and donors are being sought.
Phase I : $802,500 Site Preparation - $200,000 Tree removal, grading, drainage system installation, terracing, ground prep, side walks, common area, design, survey, permits
"Miracle League" Baseball Field - $250,00 Asphalt base, colored rubber surface, fence, player bench areas, gates, fence topper, bleachers
Wheelchair Softball Field - $250,000 Asphalt base, painted epoxy colored surface, fence, player bench areas, gates, fence topper, bleachers
Parking lot - $102,50022 handicapped and 8 regular parking spaces, sidewalk, signage
Phase II: $600,000 est.
Playground - $200,000 Final ground prep, asphalt sub-surface, colored rubber surface, playground equipment, installation, connecting sidewalk, permits
Zero entry water park - $200,000 Final ground prep, plumbing, concrete, water tank, equipment, installation, connecting sidewalk, permits Other Features - $200,000 Family pavilion, storage shed, batting cage, scoreboards, electrical service, concrete, park monument, sound system, restroom renovations, etc.
Total - $1,402,500
The ALLPLAY Foundation's goal is to raise $2 million to build ALLPLAY Park and to provide a program funding endowment and ongoing maintenance and operations.
|